GameChange Launches Pour-in-Place Ground System

By Solar Today Magazine

Racking says its self-leveling Pour-in-Place ballasted ground system reduces installation time by 68 percent.

Forms are placed and supported, the concrete is poured and panels are mounted.

The system is rated for 120 mph wind speed and meets IBC and ASME standards for structural loading.

For more information, visit gamechangeracking.com.

Leave a Reply

Your email address will not be published. Required fields are marked *

Switch Language »
Share via
Copy link